Running signal wiring and power wiring in the same conduit helps to cut down on electrical noise.

A) True
B) False

Correct Answer

verifed

verified

With Allen-Bradley controllers ____ software is required to monitor,download,and upload programs.


A) RSLinx
B) RSLogix
C) Microsoft word
D) LogixPro

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

The temporary end instruction is used when you want to change the amount of logic being scanned.

A) True
B) False

Correct Answer

verifed

verified

PLC communications protocol is a standardized method for:


A) programming PLCs.
B) connection of input devices.
C) connection of output devices.
D) transmitting data between different devices.

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

The processor of a PLC monitors its battery voltage level.

A) True
B) False

Correct Answer

verifed

verified

For most PLC installations,a NEMA ____enclosure is recommended.


A) 2
B) 4
C) 8
D) 12

E) C) and D)
F) A) and B)

Correct Answer

verifed

verified

Most solid-state switches will conduct a small amount of leakage current in the off state.

A) True
B) False

Correct Answer

verifed

verified

The suspend instruction is used to trap and identify specific conditions.

A) True
B) False

Correct Answer

verifed

verified

Ground loop circuits cause problems by adding or subtracting current or voltage from input signal sources.

A) True
B) False

Correct Answer

verifed

verified

Common potential noise generating devices include noninductive resistive loads.

A) True
B) False

Correct Answer

verifed

verified

I/O leakage problems usually occur with devices that use:


A) solid-state switching circuits.
B) hard contacts.
C) noise-suppression circuits.
D) voltage-suppression circuits.

E) A) and B)
F) B) and C)

Correct Answer

verifed

verified

With reference to the input module circuit shown,a voltmeter reading of 24 VDC would indicate: With reference to the input module circuit shown,a voltmeter reading of 24 VDC would indicate:   A) normal operation. B) a possible shorted PB. C) a possible fault in the field wiring. D) either b or c.


A) normal operation.
B) a possible shorted PB.
C) a possible fault in the field wiring.
D) either b or c.

E) A) and C)
F) All of the above

Correct Answer

verifed

verified

When a grounding connection must be made to the metal enclosure of a PLC system,any paint coating must be removed.

A) True
B) False

Correct Answer

verifed

verified

In addition to being an important safety measure,proper grounding of a PLC system can:


A) lower installation costs.
B) increase the power efficiency of the system.
C) limit the effects of EMI.
D) assist in the operation of the MCR.

E) C) and D)
F) None of the above

Correct Answer

verifed

verified

A fiber optic wired control system is most susceptible electrical noise.

A) True
B) False

Correct Answer

verifed

verified

The programming device monitor normally indicates a true instruction if the addressed input device is off and examined for an off condition.

A) True
B) False

Correct Answer

verifed

verified

Leakage current can falsely activate a PLC input.

A) True
B) False

Correct Answer

verifed

verified

Which function of a PLC would be used to view the transition history (on or off states) of a bit(s) ?


A) Change radix.
B) Forcing.
C) Cross reference.
D) Contact histogram.

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

A ground loop circuit can develop when each device's ground is tied to a different earth potential.

A) True
B) False

Correct Answer

verifed

verified

Which instruction is use to change the amount of logic scanned to progressively debug a program?


A) Suspend
B) Temporary end
C) Force
D) Timed interrupt

E) A) and B)
F) All of the above

Correct Answer

verifed

verified