Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) Inspection of I/O field devices
B) Monitoring the program
C) Checking connections to I/O modules
D) Cleaning of the PLC enclosure
Correct Answer
verified
Multiple Choice
A) trace the circuit back through the logic to locate the inputs.
B) use a programming terminal to call up the rung that controls the output to see if the output coil is on.
C) check the point where the output device's field wiring is connected to the output rack.
D) check the input modules for short-circuit conditions.
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) RSLinx
B) RSLogix
C) Microsoft word
D) LogixPro
Correct Answer
verified
Multiple Choice
A) normal operation.
B) a possible shorted PB.
C) a possible fault in the field wiring.
D) either a possible shorted PB or a possible fault in the field wiring.
Correct Answer
verified
Multiple Choice
A) RSLinx
B) RSLogix
C) Microsoft word
D) LogixPro
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) programming PLCs.
B) connecting input devices.
C) connecting output devices.
D) transmitting data between different devices.
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) fiber optic and power wiring be run in the same conduit.
B) fiber optic and signal wiring be run in the same conduit.
C) signal wiring and power wiring be run in the same conduit.
D) all of these.
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) is connected in forward-bias to suppress DC loads.
B) is connected in reverse-bias to suppress DC loads.
C) is connected in forward-bias to suppress AC loads.
D) is connected in reverse-bias to suppress AC loads.
Correct Answer
verified
Showing 81 - 99 of 99