Ploof Corporation is conducting a time-driven activity-based costing study in its Customer Service Department. The company has provided the following data to aid in that study: Ploof Corporation is conducting a time-driven activity-based costing study in its Customer Service Department. The company has provided the following data to aid in that study:   On the Capacity Analysis report in time-driven activity-based costing, the  unused capacity in minutes  would be closest to: A)  187,260 minutes B)  1,612,740 minutes C)  900,000 minutes D)  543,630 minutes On the Capacity Analysis report in time-driven activity-based costing, the "unused capacity in minutes" would be closest to:


A) 187,260 minutes
B) 1,612,740 minutes
C) 900,000 minutes
D) 543,630 minutes

E) A) and B)
F) B) and C)

Correct Answer

verifed

verified

Musich Corporation has an activity-based costing system with three activity cost pools--Machining, Setting Up, and Other. The company's overhead costs, which consist of equipment depreciation and indirect labor, have been allocated to the cost pools already and are provided in the table below. Musich Corporation has an activity-based costing system with three activity cost pools--Machining, Setting Up, and Other. The company's overhead costs, which consist of equipment depreciation and indirect labor, have been allocated to the cost pools already and are provided in the table below.    Costs in the Machining cost pool are assigned to products based on machine-hours (MHs) and costs in the Setting Up cost pool are assigned to products based on the number of batches. Costs in the Other cost pool are not assigned to products. Data concerning the two products and the company's costs appear below:    Required: a. Calculate activity rates for each activity cost pool using activity-based costing.b. Determine the amount of overhead cost that would be assigned to each product using activity-based costing.c. Determine the product margins for each product using activity-based costing. Costs in the Machining cost pool are assigned to products based on machine-hours (MHs) and costs in the Setting Up cost pool are assigned to products based on the number of batches. Costs in the Other cost pool are not assigned to products. Data concerning the two products and the company's costs appear below: Musich Corporation has an activity-based costing system with three activity cost pools--Machining, Setting Up, and Other. The company's overhead costs, which consist of equipment depreciation and indirect labor, have been allocated to the cost pools already and are provided in the table below.    Costs in the Machining cost pool are assigned to products based on machine-hours (MHs) and costs in the Setting Up cost pool are assigned to products based on the number of batches. Costs in the Other cost pool are not assigned to products. Data concerning the two products and the company's costs appear below:    Required: a. Calculate activity rates for each activity cost pool using activity-based costing.b. Determine the amount of overhead cost that would be assigned to each product using activity-based costing.c. Determine the product margins for each product using activity-based costing. Required: a. Calculate activity rates for each activity cost pool using activity-based costing.b. Determine the amount of overhead cost that would be assigned to each product using activity-based costing.c. Determine the product margins for each product using activity-based costing.

Correct Answer

verifed

verified

a.Computation of activity rate...

View Answer

Torello Corporation manufactures two products: Product H95V and Product V93N. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products H95V and V93N. Torello Corporation manufactures two products: Product H95V and Product V93N. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC)  system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products H95V and V93N.   Using the plantwide overhead rate, how much manufacturing overhead cost would be allocated to Product H95V? A)  $361,000 B)  $433,200 C)  $288,800 D)  $293,000 Using the plantwide overhead rate, how much manufacturing overhead cost would be allocated to Product H95V?


A) $361,000
B) $433,200
C) $288,800
D) $293,000

E) None of the above
F) C) and D)

Correct Answer

verifed

verified

Data concerning three of Kilmon Corporation's activity cost pools appear below: Data concerning three of Kilmon Corporation's activity cost pools appear below:    Required:Compute the activity rates for each of the three cost pools. (Round your answers to 2 decimal places.) Required:Compute the activity rates for each of the three cost pools. (Round your answers to 2 decimal places.)

Correct Answer

verifed

verified

Scheuer Corporation uses activity-based costing to compute product margins. In the first stage, the activity-based costing system allocates two overhead accounts--equipment expense and indirect labor--to three activity cost pools--Processing, Supervising, and Other--based on resource consumption. Data to perform these allocations appear below: Scheuer Corporation uses activity-based costing to compute product margins. In the first stage, the activity-based costing system allocates two overhead accounts--equipment expense and indirect labor--to three activity cost pools--Processing, Supervising, and Other--based on resource consumption. Data to perform these allocations appear below:   Distribution of Resource Consumption Across Activity Cost Pools:   In the second stage, Processing costs are assigned to products using machine-hours (MHs)  and Supervising costs are assigned to products using the number of batches. The costs in the Other activity cost pool are not assigned to products. Activity data for the company's two products follow:Activity:   Finally, sales and direct cost data are combined with Processing and Supervising costs to determine product margins.Sales and Direct Cost Data:   What is the product margin for Product Q1 under activity-based costing? A)  −$13,200 B)  $3,630 C)  $17,800 D)  $17,350 Distribution of Resource Consumption Across Activity Cost Pools: Scheuer Corporation uses activity-based costing to compute product margins. In the first stage, the activity-based costing system allocates two overhead accounts--equipment expense and indirect labor--to three activity cost pools--Processing, Supervising, and Other--based on resource consumption. Data to perform these allocations appear below:   Distribution of Resource Consumption Across Activity Cost Pools:   In the second stage, Processing costs are assigned to products using machine-hours (MHs)  and Supervising costs are assigned to products using the number of batches. The costs in the Other activity cost pool are not assigned to products. Activity data for the company's two products follow:Activity:   Finally, sales and direct cost data are combined with Processing and Supervising costs to determine product margins.Sales and Direct Cost Data:   What is the product margin for Product Q1 under activity-based costing? A)  −$13,200 B)  $3,630 C)  $17,800 D)  $17,350 In the second stage, Processing costs are assigned to products using machine-hours (MHs) and Supervising costs are assigned to products using the number of batches. The costs in the Other activity cost pool are not assigned to products. Activity data for the company's two products follow:Activity: Scheuer Corporation uses activity-based costing to compute product margins. In the first stage, the activity-based costing system allocates two overhead accounts--equipment expense and indirect labor--to three activity cost pools--Processing, Supervising, and Other--based on resource consumption. Data to perform these allocations appear below:   Distribution of Resource Consumption Across Activity Cost Pools:   In the second stage, Processing costs are assigned to products using machine-hours (MHs)  and Supervising costs are assigned to products using the number of batches. The costs in the Other activity cost pool are not assigned to products. Activity data for the company's two products follow:Activity:   Finally, sales and direct cost data are combined with Processing and Supervising costs to determine product margins.Sales and Direct Cost Data:   What is the product margin for Product Q1 under activity-based costing? A)  −$13,200 B)  $3,630 C)  $17,800 D)  $17,350 Finally, sales and direct cost data are combined with Processing and Supervising costs to determine product margins.Sales and Direct Cost Data: Scheuer Corporation uses activity-based costing to compute product margins. In the first stage, the activity-based costing system allocates two overhead accounts--equipment expense and indirect labor--to three activity cost pools--Processing, Supervising, and Other--based on resource consumption. Data to perform these allocations appear below:   Distribution of Resource Consumption Across Activity Cost Pools:   In the second stage, Processing costs are assigned to products using machine-hours (MHs)  and Supervising costs are assigned to products using the number of batches. The costs in the Other activity cost pool are not assigned to products. Activity data for the company's two products follow:Activity:   Finally, sales and direct cost data are combined with Processing and Supervising costs to determine product margins.Sales and Direct Cost Data:   What is the product margin for Product Q1 under activity-based costing? A)  −$13,200 B)  $3,630 C)  $17,800 D)  $17,350 What is the product margin for Product Q1 under activity-based costing?


A) −$13,200
B) $3,630
C) $17,800
D) $17,350

E) A) and D)
F) None of the above

Correct Answer

verifed

verified

Tomasini Corporation has provided the following data from its activity-based costing accounting system: Tomasini Corporation has provided the following data from its activity-based costing accounting system:   Distribution of Resource Consumption across Activity Cost Pools:   The  Other  activity cost pool consists of the costs of idle capacity and organization-sustaining costs that are not assigned to products.How much supervisory wages and factory supplies cost would NOT be assigned to products using the activity-based costing system? A)  $119,000 B)  $620,000 C)  $220,000 D)  $0 Distribution of Resource Consumption across Activity Cost Pools: Tomasini Corporation has provided the following data from its activity-based costing accounting system:   Distribution of Resource Consumption across Activity Cost Pools:   The  Other  activity cost pool consists of the costs of idle capacity and organization-sustaining costs that are not assigned to products.How much supervisory wages and factory supplies cost would NOT be assigned to products using the activity-based costing system? A)  $119,000 B)  $620,000 C)  $220,000 D)  $0 The "Other" activity cost pool consists of the costs of idle capacity and organization-sustaining costs that are not assigned to products.How much supervisory wages and factory supplies cost would NOT be assigned to products using the activity-based costing system?


A) $119,000
B) $620,000
C) $220,000
D) $0

E) A) and B)
F) B) and D)

Correct Answer

verifed

verified

Nick Company has two products: A and B. The company uses activity-based costing. The total cost and activity for each of the company's three activity cost pools are as follows: Nick Company has two products: A and B. The company uses activity-based costing. The total cost and activity for each of the company's three activity cost pools are as follows:   The activity rate under the activity-based costing system for Activity 3 is closest to: A)  $525.00 B)  $44.65 C)  $105.00 D)  $205.00 The activity rate under the activity-based costing system for Activity 3 is closest to:


A) $525.00
B) $44.65
C) $105.00
D) $205.00

E) A) and D)
F) B) and C)

Correct Answer

verifed

verified

Gauch Corporation is conducting a time-driven activity-based costing study in its Customer Support Department. The company has provided the following data to aid in that study: Gauch Corporation is conducting a time-driven activity-based costing study in its Customer Support Department. The company has provided the following data to aid in that study:   The cost per minute of the resource supplied is $0.40.On the Customer Cost Analysis report in time-driven activity-based costing, the Receiving Calls cost assigned to Customer N would be closest to: A)  $117.60 B)  $108.00 C)  $77.60 D)  $7.20 The cost per minute of the resource supplied is $0.40.On the Customer Cost Analysis report in time-driven activity-based costing, the Receiving Calls cost assigned to Customer N would be closest to:


A) $117.60
B) $108.00
C) $77.60
D) $7.20

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Meester Corporation has an activity-based costing system with three activity cost pools--Machining, Order Filling, and Other. In the first stage allocations, costs in the two overhead accounts, equipment depreciation and supervisory expense, are allocated to three activity cost pools based on resource consumption. Data used in the first stage allocations follow: Meester Corporation has an activity-based costing system with three activity cost pools--Machining, Order Filling, and Other. In the first stage allocations, costs in the two overhead accounts, equipment depreciation and supervisory expense, are allocated to three activity cost pools based on resource consumption. Data used in the first stage allocations follow:   Distribution of Resource Consumption Across Activity Cost Pools:   Machining costs are assigned to products using machine-hours (MHs)  and Order Filling costs are assigned to products using the number of orders. The costs in the Other activity cost pool are not assigned to products. Activity data for the company's two products follow:Activity:   The activity rate for the Order Filling activity cost pool under activity-based costing is closest to: A)  $8.00 per order B)  $13.33 per order C)  $10.40 per order D)  $104.00 per order Distribution of Resource Consumption Across Activity Cost Pools: Meester Corporation has an activity-based costing system with three activity cost pools--Machining, Order Filling, and Other. In the first stage allocations, costs in the two overhead accounts, equipment depreciation and supervisory expense, are allocated to three activity cost pools based on resource consumption. Data used in the first stage allocations follow:   Distribution of Resource Consumption Across Activity Cost Pools:   Machining costs are assigned to products using machine-hours (MHs)  and Order Filling costs are assigned to products using the number of orders. The costs in the Other activity cost pool are not assigned to products. Activity data for the company's two products follow:Activity:   The activity rate for the Order Filling activity cost pool under activity-based costing is closest to: A)  $8.00 per order B)  $13.33 per order C)  $10.40 per order D)  $104.00 per order Machining costs are assigned to products using machine-hours (MHs) and Order Filling costs are assigned to products using the number of orders. The costs in the Other activity cost pool are not assigned to products. Activity data for the company's two products follow:Activity: Meester Corporation has an activity-based costing system with three activity cost pools--Machining, Order Filling, and Other. In the first stage allocations, costs in the two overhead accounts, equipment depreciation and supervisory expense, are allocated to three activity cost pools based on resource consumption. Data used in the first stage allocations follow:   Distribution of Resource Consumption Across Activity Cost Pools:   Machining costs are assigned to products using machine-hours (MHs)  and Order Filling costs are assigned to products using the number of orders. The costs in the Other activity cost pool are not assigned to products. Activity data for the company's two products follow:Activity:   The activity rate for the Order Filling activity cost pool under activity-based costing is closest to: A)  $8.00 per order B)  $13.33 per order C)  $10.40 per order D)  $104.00 per order The activity rate for the Order Filling activity cost pool under activity-based costing is closest to:


A) $8.00 per order
B) $13.33 per order
C) $10.40 per order
D) $104.00 per order

E) None of the above
F) A) and C)

Correct Answer

verifed

verified

Scholfield Enterprises makes a variety of products that it sells to other businesses. The company's activity-based costing system has four activity cost pools for assigning costs to products and customers. Details concerning that activity-based costing system are listed below: Scholfield Enterprises makes a variety of products that it sells to other businesses. The company's activity-based costing system has four activity cost pools for assigning costs to products and customers. Details concerning that activity-based costing system are listed below:   The cost of serving customers, $1,191.00 per customer, is the cost of serving a customer for one year.Latif Corporation buys only one of the company's products which Scholfield Enterprises sells for $15.60 per unit. Last year Latif Corporation ordered a total of 1,100 units of this product in 2 orders. To fill the orders, 7 batches were required. The direct materials cost is $7.85 per unit and the direct labor cost is $1.90 per unit. Each unit requires 0.10 direct labor-hours.According to the activity-based costing system, the total cost of the activity  Supporting assembly  for this customer this past year was closest to: A)  $720.50 B)  $110.00 C)  $0.66 D)  $7,205.00 The cost of serving customers, $1,191.00 per customer, is the cost of serving a customer for one year.Latif Corporation buys only one of the company's products which Scholfield Enterprises sells for $15.60 per unit. Last year Latif Corporation ordered a total of 1,100 units of this product in 2 orders. To fill the orders, 7 batches were required. The direct materials cost is $7.85 per unit and the direct labor cost is $1.90 per unit. Each unit requires 0.10 direct labor-hours.According to the activity-based costing system, the total cost of the activity "Supporting assembly" for this customer this past year was closest to:


A) $720.50
B) $110.00
C) $0.66
D) $7,205.00

E) All of the above
F) C) and D)

Correct Answer

verifed

verified

Aresco Corporation manufactures two products: Product G51B and Product E48X. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products G51B and E48X. Aresco Corporation manufactures two products: Product G51B and Product E48X. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products G51B and E48X.    Required:a. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product G51B?b. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product E48X?c. Using theactivity-based costing system, what percentage of the total overhead cost is assigned to Product G51B?d. Using theactivity-based costing system, what percentage of the total overhead cost is assigned to Product E48X? Required:a. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product G51B?b. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product E48X?c. Using theactivity-based costing system, what percentage of the total overhead cost is assigned to Product G51B?d. Using theactivity-based costing system, what percentage of the total overhead cost is assigned to Product E48X?

Correct Answer

verifed

verified

a. & b. The company's plantwide overhead...

View Answer

Riedell Corporation is conducting a time-driven activity-based costing study in its Tech Support Department. The company has provided the following data to aid in that study: Riedell Corporation is conducting a time-driven activity-based costing study in its Tech Support Department. The company has provided the following data to aid in that study:    Required:Prepare a time-driven activity-based costing Capacity Analysis report for the Tech Support Department that determines the impact on expenses of matching capacity with demand. (Negative amounts should be indicated by a minus sign. Round your intermediate calculations to the nearest whole number.) Required:Prepare a time-driven activity-based costing Capacity Analysis report for the Tech Support Department that determines the impact on expenses of matching capacity with demand. (Negative amounts should be indicated by a minus sign. Round your intermediate calculations to the nearest whole number.)

Correct Answer

verifed

verified

Doell Corporation is conducting a time-driven activity-based costing study in its Tech Support Department. The company has provided the following data to aid in that study: Doell Corporation is conducting a time-driven activity-based costing study in its Tech Support Department. The company has provided the following data to aid in that study:   On the Customer Cost Analysis report in time-driven activity-based costing, the time-driven activity rate for Routing Calls would be closest to: A)  $6.84 per call routed B)  $0.38 per call routed C)  $18.00 per call routed D)  $3.11 per call routed On the Customer Cost Analysis report in time-driven activity-based costing, the time-driven activity rate for Routing Calls would be closest to:


A) $6.84 per call routed
B) $0.38 per call routed
C) $18.00 per call routed
D) $3.11 per call routed

E) C) and D)
F) B) and D)

Correct Answer

verifed

verified

Paparo Corporation has provided the following data from its activity-based costing system: Paparo Corporation has provided the following data from its activity-based costing system:   Data concerning the company's product Q79Y appear below:   According to the activity-based costing system, the average cost of product Q79Y is closest to: A)  $133.29 per unit B)  $85.03 per unit C)  $127.43 per unit D)  $129.94 per unit Data concerning the company's product Q79Y appear below: Paparo Corporation has provided the following data from its activity-based costing system:   Data concerning the company's product Q79Y appear below:   According to the activity-based costing system, the average cost of product Q79Y is closest to: A)  $133.29 per unit B)  $85.03 per unit C)  $127.43 per unit D)  $129.94 per unit According to the activity-based costing system, the average cost of product Q79Y is closest to:


A) $133.29 per unit
B) $85.03 per unit
C) $127.43 per unit
D) $129.94 per unit

E) All of the above
F) A) and C)

Correct Answer

verifed

verified

Jahnel Corporation is conducting a time-driven activity-based costing study in its Tech Support Department. The company has provided the following data to aid in that study: Jahnel Corporation is conducting a time-driven activity-based costing study in its Tech Support Department. The company has provided the following data to aid in that study:   On the Customer Cost Analysis report in time-driven activity-based costing, the time-driven activity rate for Routing Calls would be closest to: A)  $5.60 per call routed B)  $14.00 per call routed C)  $0.40 per call routed D)  $3.86 per call routed On the Customer Cost Analysis report in time-driven activity-based costing, the time-driven activity rate for Routing Calls would be closest to:


A) $5.60 per call routed
B) $14.00 per call routed
C) $0.40 per call routed
D) $3.86 per call routed

E) B) and C)
F) All of the above

Correct Answer

verifed

verified

Foster Florist specializes in large floral bouquets for hotels and other commercial spaces. The company has provided the following data concerning its annual overhead costs and its activity-based costing system: Foster Florist specializes in large floral bouquets for hotels and other commercial spaces. The company has provided the following data concerning its annual overhead costs and its activity-based costing system:   Distribution of resource consumption:   The  Other  activity cost pool consists of the costs of idle capacity and organization-sustaining costs.The amount of activity for the year is as follows:   What would be the total overhead cost per bouquet according to the activity-based costing system? In other words, what would be the overall activity rate for the making bouquets activity cost pool? (Round to the nearest whole cent.)  A)  $1.79 B)  $1.73 C)  $2.10 D)  $1.35 Distribution of resource consumption: Foster Florist specializes in large floral bouquets for hotels and other commercial spaces. The company has provided the following data concerning its annual overhead costs and its activity-based costing system:   Distribution of resource consumption:   The  Other  activity cost pool consists of the costs of idle capacity and organization-sustaining costs.The amount of activity for the year is as follows:   What would be the total overhead cost per bouquet according to the activity-based costing system? In other words, what would be the overall activity rate for the making bouquets activity cost pool? (Round to the nearest whole cent.)  A)  $1.79 B)  $1.73 C)  $2.10 D)  $1.35 The "Other" activity cost pool consists of the costs of idle capacity and organization-sustaining costs.The amount of activity for the year is as follows: Foster Florist specializes in large floral bouquets for hotels and other commercial spaces. The company has provided the following data concerning its annual overhead costs and its activity-based costing system:   Distribution of resource consumption:   The  Other  activity cost pool consists of the costs of idle capacity and organization-sustaining costs.The amount of activity for the year is as follows:   What would be the total overhead cost per bouquet according to the activity-based costing system? In other words, what would be the overall activity rate for the making bouquets activity cost pool? (Round to the nearest whole cent.)  A)  $1.79 B)  $1.73 C)  $2.10 D)  $1.35 What would be the total overhead cost per bouquet according to the activity-based costing system? In other words, what would be the overall activity rate for the making bouquets activity cost pool? (Round to the nearest whole cent.)


A) $1.79
B) $1.73
C) $2.10
D) $1.35

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Code Corporation is conducting a time-driven activity-based costing study in its Customer Service Department. The company has provided the following data to aid in that study: Code Corporation is conducting a time-driven activity-based costing study in its Customer Service Department. The company has provided the following data to aid in that study:   On the Customer Cost Analysis report in time-driven activity-based costing, the Resolving Queries cost assigned to Customer G would be closest to: A)  $10.36 B)  $127.77 C)  $186.48 D)  $108.20 On the Customer Cost Analysis report in time-driven activity-based costing, the Resolving Queries cost assigned to Customer G would be closest to:


A) $10.36
B) $127.77
C) $186.48
D) $108.20

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

Hails Corporation manufactures two products: Product Q21F and Product H44W. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Q21F and H44W. Hails Corporation manufactures two products: Product Q21F and Product H44W. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC)  system that allocates its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Q21F and H44W.   Using the plantwide overhead rate, the percentage of the total overhead cost that is allocated to Product H44W is closest to: A)  40.00% B)  50.00% C)  17.81% D)  21.30% Using the plantwide overhead rate, the percentage of the total overhead cost that is allocated to Product H44W is closest to:


A) 40.00%
B) 50.00%
C) 17.81%
D) 21.30%

E) A) and B)
F) B) and C)

Correct Answer

verifed

verified

Riedell Corporation is conducting a time-driven activity-based costing study in its Tech Support Department. The company has provided the following data to aid in that study: Riedell Corporation is conducting a time-driven activity-based costing study in its Tech Support Department. The company has provided the following data to aid in that study:    Required:Prepare a time-driven activity-based costing Capacity Analysis report for the Tech Support Department that determines the impact on expenses of matching capacity with demand. Required:Prepare a time-driven activity-based costing Capacity Analysis report for the Tech Support Department that determines the impact on expenses of matching capacity with demand.

Correct Answer

verifed

verified

blured image blured image Step 2: Calculate the unused...

View Answer

Mongiello Corporation is conducting a time-driven activity-based costing study in its Customer Support Department. The company has provided the following data to aid in that study: Mongiello Corporation is conducting a time-driven activity-based costing study in its Customer Support Department. The company has provided the following data to aid in that study:   On the Customer Cost Analysis report in time-driven activity-based costing, the time-driven activity rate for Resolving Issues would be closest to: A)  $9.12 per issue resolved B)  $0.38 per issue resolved C)  $24.00 per issue resolved D)  $1.58 per issue resolved On the Customer Cost Analysis report in time-driven activity-based costing, the time-driven activity rate for Resolving Issues would be closest to:


A) $9.12 per issue resolved
B) $0.38 per issue resolved
C) $24.00 per issue resolved
D) $1.58 per issue resolved

E) A) and D)
F) C) and D)

Correct Answer