A project can be subdivided into which of the following?


A) Job orders
B) Subjobs
C) Work Package
D) Sub-paths
E) Events and decisions

F) A) and D)
G) A) and E)

Correct Answer

verifed

verified

A company wants to use CPM analysis to manage their project.One of the activities that make up the project has an uncertain duration.Three estimates have been given to determine this activity's duration.The estimates are optimistically 1 hour,most likely 5 hours and pessimistic 6 hours.Using the three activity time estimation procedure for CPM,what is the expected time this activity will take?


A) 2.5 hours
B) 3.5 hours
C) 4.5 hours
D) 5.5 hours
E) None of the above

F) B) and E)
G) All of the above

Correct Answer

verifed

verified

Project management software available today combines CPM and other scheduling aids,like Gantt charting,to aid in tracking progress of project completion.

A) True
B) False

Correct Answer

verifed

verified

What is that sequence of activities that consume the longest amount of time in a project network of activities called?

Correct Answer

verifed

verified

The work breakdown structure (WBS)defines a hierarchy of project tasks,subtasks and work packages.

A) True
B) False

Correct Answer

verifed

verified

Project Management can be defined as planning,directing and controlling resources to meet the technical,cost and time constraints of the project.

A) True
B) False

Correct Answer

verifed

verified

An assumption of three-activity-time CPM analysis is that the activity time estimates conform to the beta distribution.Which of the following is a valid criticism of this assumption?


A) Project activities cannot always be networked
B) Project control doesn't focus enough on the critical path
C) Obtaining three valid time estimates to put into the formula is difficult
D) Beta distributions do not occur naturally
E) None of the above

F) A) and E)
G) A) and D)

Correct Answer

verifed

verified

Below are the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the costs include both direct and indirect costs.  Immediate  Normal  Crash  Normal  Crash  Activity  Predecessor  Time  Time  Cost  Cost  A  None 32$200$400 B  A 43$300$600 C  A 11$200$200 D  B and C 32$500$550 E  D 21$500$900\begin{array}{|l|l|l|l|l|l|}\hline & \text { Immediate } & \text { Normal } & \text { Crash } & \text { Normal } & \text { Crash } \\\hline \text { Activity } & \text { Predecessor } & \text { Time } & \text { Time } & \text { Cost } & \text { Cost } \\\hline \text { A } & \text { None } & 3 & 2 & \$ 200 & \$ 400 \\\hline \text { B } & \text { A } & 4 & 3 & \$ 300 & \$ 600 \\\hline \text { C } & \text { A } & 1 & 1 & \$ 200 & \$ 200 \\\hline \text { D } & \text { B and C } & 3 & 2 & \$ 500 & \$ 550 \\\hline \text { E } & \text { D } & 2 & 1 & \$ 500 & \$ 900 \\\hline\end{array} What are the total time of this project and total normal cost?


A) Total time is 13 days,total cost is $1,200
B) Total time is 12 days,total cost is $1,700
C) Total time is 11 days,total cost is $1,600
D) Total time is 10 days,total cost is $1,750
E) Total time is 9 days,total cost is $1,700

F) B) and C)
G) B) and D)

Correct Answer

verifed

verified

A series of projects that are organized in such a way that each project utilizes people from different functional areas is using which of the following organizational structures?


A) Matrix project
B) Integrated Task Force
C) Functional project
D) Pure project
E) Cross-functional flexible team

F) A) and D)
G) B) and E)

Correct Answer

verifed

verified

A disadvantage of a matrix project organizational structure is that a project manager is held responsible for successful completion of the project.

A) True
B) False

Correct Answer

verifed

verified

To calculate the variances of activity times in CPM analysis we must use all three time estimates (i.e. ,optimistic,most likely and pessimistic time estimates).

A) True
B) False

Correct Answer

verifed

verified

The second step in managing a project is writing the Statement of Work (SOW).

A) True
B) False

Correct Answer

verifed

verified

In a CPM analysis if you subtract the early finish from the late finish the result is the activity's slack time.

A) True
B) False

Correct Answer

verifed

verified

Describe how CPM handles the trade-offs between time and cost in the scheduling of a project?

Correct Answer

verifed

verified

This question can elicit a variety of re...

View Answer

The "Z" value used to calculate the probabilities in CPM analysis is based on the Beta probability distribution.

A) True
B) False

Correct Answer

verifed

verified

Below are the data for a Time-Cost CPM Scheduling model analysis.The time is in days and the costs include both direct and indirect costs.  Immediate  Normal  Crash  Normal  Crash  Activity  Predecessor  Time  Time  Cost  Cost  A  None 32$200$400 B  A 43$300$600 C  A 11$300$300 D  B and C 32$500$550 E  D 21$500$900\begin{array}{|l|l|l|l|l|l|}\hline & \text { Immediate } & \text { Normal } & \text { Crash } & \text { Normal } & \text { Crash } \\\hline \text { Activity } & \text { Predecessor } & \text { Time } & \text { Time } & \text { Cost } & \text { Cost } \\\hline \text { A } & \text { None } & 3 & 2 & \$ 200 & \$ 400 \\\hline \text { B } & \text { A } & 4 & 3 & \$ 300 & \$ 600 \\\hline \text { C } & \text { A } & 1 & 1 & \$ 300 & \$ 300 \\\hline \text { D } & \text { B and C } & 3 & 2 & \$ 500 & \$ 550 \\\hline \text { E } & \text { D } & 2 & 1 & \$ 500 & \$ 900 \\\hline\end{array} If you crash this project to reduce the total time by one day what is the total time of the project and total cost?


A) Total time is 13 days,total cost is $1,500
B) Total time is 12 days,total cost is $2,000
C) Total time is 12 days,total cost is $2,300
D) Total time is 11 days,total cost is $1,850
E) Total time is 11 days,total cost is $2,350

F) A) and D)
G) A) and E)

Correct Answer

verifed

verified

A company must perform a maintenance project consisting of seven activities.The activities,their predecessors and their respective time estimates are presented below:  Immediate  Activity  Designation  Predecessor  Time in Days  Break down both machines  A  None 3 Clean machine 1  B  A 3 Clean machine 2  C  A 3 Re-set machine 1  D  B 4 Re-set machine 2  E  C 2 Re-calibrate both machines  F  D and E 1 Final test  G  F 2\begin{array}{|l|l|l|l|}\hline & & \text { Immediate } & \\\hline \text { Activity } & \text { Designation } & \text { Predecessor } & \text { Time in Days } \\\hline \text { Break down both machines } & \text { A } & \text { None } & 3 \\\hline \text { Clean machine 1 } & \text { B } & \text { A } & 3 \\\hline \text { Clean machine 2 } & \text { C } & \text { A } & 3 \\\hline \text { Re-set machine 1 } & \text { D } & \text { B } & 4 \\\hline \text { Re-set machine 2 } & \text { E } & \text { C } & 2 \\\hline \text { Re-calibrate both machines } & \text { F } & \text { D and E } & 1 \\\hline \text { Final test } & \text { G } & \text { F } & 2 \\\hline\end{array} Using the Single Time Estimate CPM procedure,which activities make up the critical path?


A) A,B,D,F,G
B) A,C,E,F,G
C) A,C,B,F,E
D) A,D,E
E) None of the above

F) D) and E)
G) B) and D)

Correct Answer

verifed

verified

Which of the following is a graphic project report used in project management?


A) Project proposal
B) Approved project plan
C) Humphrey chart
D) Equipment and supplies chart
E) Cost and performance tracking schedule

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

The critical path of activities in a project is the sequence of activities that form the shortest chain in a project network of activities.

A) True
B) False

Correct Answer

verifed

verified

You have just performed a Single Time Estimate CPM analysis and have found that more than one path through the project network has zero slack values.What can you conclude?


A) You have incorrectly performed the analysis
B) You have multiple critical paths
C) Only one path is optimal
D) More than one path is optimal
E) The project will not be completed by the desired time

F) A) and E)
G) C) and D)

Correct Answer

verifed

verified